Navigation





Traffic Conditions for Bayonne, New Jersey


Traffic Alerts found for Bayonne, New Jersey

Lane closed, on US-22 at PARK AVE

SCHEDULED WORK CREW; .LONG TERM WORK AT THE INTERSECTION ON THE OVERPASS CAUSING LANE SHIFTS AND VARIOUS LANE CLOSURES UNTIL THE END OF 2011.EXPECT DELAYS DURING PEAK TRAVEL TIMES.


Shoulder closed, on I-78 WB at LYONS AVE

SCHEDULED WORK CREW; RIGHT LANE AND SHOULDER CLOSED FOR REPAIRS UNTIL 12 PM FRIDAY, DECEMBER 31, 2010.


Closed, on GOETHALS BRG EB at GOETHALS BRG

One of two lanes in each direction may be closed, as needed from 10pm to 5am weeknights for PANY NJ maintenance.


Closed, on GOETHALS BRG WB at GOETHALS BRG

One of two lanes in each direction may be closed, as needed from 10pm to 5am weeknights for PANY NJ maintenance.


Closed, on BAYONNE BRG NB at BAYONNE BRG

One of two lanes in each direction may be closed 6:30am to 2pm weekdays as needed, for PANY NJ maintenance.


Closed, on BAYONNE BRG SB at BAYONNE BRG

One of two lanes in each direction may be closed 6:30am to 2pm weekdays as needed, for PANY NJ maintenance.


Lane closed, on HOLLAND TUNL WB at HOLLAND TUNL

AAs of January 3, 2010 the 2004 restriction that prohibited 2 axle and 3 axle single unit trucks from using the eastbound tunnel to New York was lifted. All 4, 5 axle and 6 axle trucks as well as all 3 axle dual unit trucks, trailers and towed vehicles remain restricted from using the tunnel in both directions. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance.


Lane closed, on HOLLAND TUNL EB at HOLLAND TUNL

AAs of January 3, 2010 the 2004 restriction that prohibited 2 axle and 3 axle single unit trucks from using the eastbound tunnel to New York was lifted. All 4, 5 axle and 6 axle trucks as well as all 3 axle dual unit trucks, trailers and towed vehicles remain restricted from using the tunnel in both directions. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance.


Road maintenance operations, on BROOKLYN BRG EB at BROOKLYN BRG

This Bridge is closed to Manhattan bound traffic overnight as of Monday night August 23rd 2010 to perform necessary long term rehabilitation and repainting work. Brooklyn bound traffic will be maintained throughout the project as will the span s pedestrian and cycling path. Motorists should follow signed routes to access the bridge leaving Manhattan. The northbound FDR exit to the Brooklyn Bridge is closed starting 1 hour before closure hours noted below. Motorists should use the prior South Street exit. The Brooklyn Queens Expressway exit to the Brooklyn Bridge is closed starting as early as 30 minutes before closure hours noted below. Motorists should proceed to the following Manhattan Bridge exit or use the prior Brooklyn Battery Tunnel pay toll exit for access to Manhattan. All work will occur overnight during off peak hours, when Manhattan bound motorists will be detoured to the nearby Manhattan Bridge, or may choose other crossings.


Closed, on HAMILTON AVE at CLINTON ST

One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.


Closed, on MANHATTAN BRG EB at MANHATTAN BRG

There are four lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and two on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . One lane on the north upper roadway and on lane on the lower roadway may be closed, as needed, 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 830pm there are five lanes eastbound and two lanes westbound. To facilitate traffic flow detoured from the Brooklyn Bridge there will be five lanes westbound to Manhattan, and two lanes eastbound to Brooklyn from 9pm to 10am Monday to Friday as well as the weekends from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times.


Closed, on 3RD AVE at PROSPECT EXPY

One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.


Closed, on MANHATTAN BRG WB at MANHATTAN BRG

There are four lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and two on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . One lane on the north upper roadway and on lane on the lower roadway may be closed, as needed, 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 830pm there are five lanes eastbound and two lanes westbound. To facilitate traffic flow detoured from the Brooklyn Bridge there will be five lanes westbound to Manhattan, and two lanes eastbound to Brooklyn from 9pm to 10am Monday to Friday as well as the weekends from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times.


Bridge maintenance operations, on WILLIAMSBURG BRG EB at WILLIAMSBURG BRG

There are four lanes westbound Manhattan bound and two lanes eastbound Brooklyn bound with two lanes closed for construction in the off peak direction weekdays from 6am to 10am. Weekdays from 10am to 3pm there are three lanes maintained inbound, and two lanes maintained for traffic outbound with three lanes closed for construction activity. There are four lanes eastbound and four lanes westbound all other times. These off peak hour lane closures are required as needed to facilitate NYCDOT bridge maintenance and rehabilitation work through December 2010. Truck traffic is allowed on the bridge in both directions on the outer roadways only. Pedestrian and bicycle access maintained at all times.


Road construction, on E 12TH ST at AVENUE D

East 12th Street was converted March 19, 2005 to one way westbound, and Szold Place to one way southbound to assist with NYCDEP s pumping station project through December 2010.


Closed, on 5TH AVE at FLATBUSH AVE

SCHEDULED WORK CREW; ROAD CLOSED; FOR OF THE NETS NEW ARENA.ALSO CLOSED PERMANENTLY PACIFIC ST FROM 5TH AVE TO 6TH AVE, PACIFIC ST FROM VANDERBILT AVE TO CARLTON AVE .6TH AVE FROM FLATBUSH AVE TO PACIFIC AVE WILL BECOME TWO WAY PACIFIC AVE FROM CARLTON AVE TO 6TH AVE WILL BE ONE WAY; SEEK ALTERNATE.


Road construction, on SZOLD PL at E 12TH ST

East 12th Street was converted March 19, 2005 to one way westbound, and Szold Place to one way southbound to assist with NYCDEP s pumping station project through December 2010.


On ramp closed, on FDR DR NB at HOUSTON ST

ON RAMP CLOSED; WITH EMERGENCY CONSTRUCTION UFN, ALSO AT 15TH ST EMERGENCY RIGHT LANE CONSTRUCTION UFN.


Closed, on AVENUE D at E 12TH ST

This roadway was closed as of March 19, 2005, to facilitate NYCDEP pumping station capital project through December 2010.


Closed, on CARLTON AVE BRG at PACIFIC ST

This bridge was closed January 23, 2008. Motorists and bicyclist should use alternate route or follow posted detour. Pedestrians must use the adjacent 6th Avenue Bridge, or Vanderbilt Avenue. This is a long term project to upgrade the LIRR yard and construct a new bridge. This work is being performed by a private developer contractor and estimated for completion April 2012.


Bridge maintenance operations, on WILLIAMSBURG BRG WB at WILLIAMSBURG BRG

There are four lanes westbound Manhattan bound and two lanes eastbound Brooklyn bound with two lanes closed for construction in the off peak direction weekdays from 6am to 10am. Weekdays from 10am to 3pm there are three lanes maintained inbound, and two lanes maintained for traffic outbound with three lanes closed for construction activity. There are four lanes eastbound and four lanes westbound all other times. These off peak hour lane closures are required as needed to facilitate NYCDOT bridge maintenance and rehabilitation work through December 2010. Truck traffic is allowed on the bridge in both directions on the outer roadways only. Pedestrian and bicycle access maintained at all times.


Lane closed, on LINCOLN TUNL WB at LINCOLN TUNL

One of three tubes is closed Monday through Friday from 11pm to 5am and Saturday 1am to 9am and Sunday from 1am to 10am for PANY NJ maintenance activity. During these times two tubes will remain open with two lanes of traffic available in each direction. These lane closures are required to facilitate PANY amp; NJ work.


Lane closed, on LINCOLN TUNL EB at LINCOLN TUNL

One of three tubes is closed Monday through Friday from 11pm to 5am and Saturday 1am to 9am and Sunday from 1am to 10am for PANY NJ maintenance activity. During these times two tubes will remain open with two lanes of traffic available in each direction. These lane closures are required to facilitate PANY amp; NJ work.


Road construction, on E 13TH ST at AVENUE D

This street was converted to a two way dead end street as of March 19, 2005 related to NYCDEP s pumping station project through December 2010.


Closed, on 65TH ST at 3RD AVE

One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.


Closed, on 86TH ST at 5TH AVE

This roadway may be closed as need 9pm to 6am weeknights, and 11pm Friday to 8am Saturday and 11pm Saturday to 8am Sunday to facilitate NYCDDC roadway and precinct building construction activity through mid November 2010.


Lane closed, on GEORGE WASHINGTON BRG EB at GEORGE WASHINGTON BRG

Lane closures may occur off peak hours to facilitate PANY NJ maintenance work.


Road construction, on QUEENSBORO BRG NB at QUEENSBORO BRG

The North Inner Lower Roadway is Manhattan bound with access from Queens Plaza North to Second Avenue and East 60th Street. The South Inner Lower roadway is Queens bound with access from 2nd Avenue to Queens Plaza South. Trucks are allowed on the lower inner roadways only. Trucks are prohibited from the upper and outer roadways. The North Upper Roadway is Manhattan bound at all times. Access is to East 62nd Street East 63rd Street in Manhattan from Thomson Avenue, 21st Street at Queens Plaza North, and 11th Street at Queens Plaza South in Queens. The South Upper Roadway is Queens bound except Monday to Friday from 6am to 9:30am when the roadway is reversed and accommodates the Manhattan bound high occupancy vehicle HOV lane containing two or more people. Access is to East 58th Street East 57th Street in Manhattan from Thomson Avenue or 21st Street at 43rd Avenue in Queens.


Road construction, on 2ND AVE at EAST 96TH

As of April 24, 2007 four lanes of traffic maintained 7am to 10am, and 3pm to 7pm weekdays, three lanes other times to facilitate long term NYCT Second Avenue Subway construction activity to the end of 2010.


Closed, on 145TH ST BRG EB at HARLEM RIVER

As of June 17th 2007 two lanes in each direction were reopened to traffic. One of two lanes in each direction may be closed 7am to 3:30pm Bronx bound and 9am to 5pm Manhattan bound weekdays. Full closure of bridge may occur as needed 10pm to 6am Monday to Friday, and 12:01am to 7am Saturday to facilitate testing and maintenance operation between August 2 and September 11, 2010. These closures will not occur during NY Yankee home day games until minimum of 2 hours after game ends.


Closed, on 145TH ST BRG WB at HARLEM RIVER

As of June 17th 2007 two lanes in each direction were reopened to traffic. One of two lanes in each direction may be closed 7am to 3:30pm Bronx bound and 9am to 5pm Manhattan bound weekdays. Full closure of bridge may occur as needed 10pm to 6am Monday to Friday, and 12:01am to 7am Saturday to facilitate testing and maintenance operation between August 2 and September 11, 2010. These closures will not occur during NY Yankee home day games until minimum of 2 hours after game ends.



Traffic Web Services from Yahoo!


Looking to Purchase Local Web Advertising for Bayonne, New Jersey ?